Preliminary treatment
Fine screens (typically 3–6 mm) and a grit chamber remove rags, plastics and sand that would abrade pumps and settle in the tanks downstream.
Water and wastewater engineering, Jeddah
We design, build and operate water, wastewater and waste treatment plants for industry, towns and cities across Saudi Arabia, the Middle East, Africa and India. One accountable team, from first study to daily operation.
Fig. 1 Circular clarifier, plan view
Much of the water people here rely on is drawn from the sea or pumped from deep underground, and every cubic metre carries a real cost. Green Crescent exists to make each one go further.
We engineer plants that treat raw, brackish and waste water to the quality each use demands, from process water to irrigation and compliant discharge, then we stay on to operate and maintain them.
One litre of raw municipal sewage, followed from the inlet works to effluent fit for reuse.
Stage 01 of 05
Fine screens (typically 3–6 mm) and a grit chamber remove rags, plastics and sand that would abrade pumps and settle in the tanks downstream.
In the primary clarifier, settleable solids are scraped to the hopper as primary sludge, removing about 50–70% of suspended solids and 25–40% of BOD.
In the aeration tank, activated sludge oxidises dissolved organics (BOD) and nitrifies ammonia; the secondary clarifier returns the biomass and leaves BOD and TSS typically below 20 mg/L.
Multimedia sand filters, activated carbon or ultrafiltration membranes remove residual solids, colour and turbidity, typically to below 2 NTU.
UV irradiation, chlorination or ozone inactivates the remaining pathogens, so the effluent meets reuse standards for irrigation, cooling-tower make-up and process water.
Compact, energy-efficient plants for factories, towns and commercial sites.



Seawater and brackish-water desalination by reverse osmosis or thermal processes, with softening and demineralisation for boiler and process water.
Technologies



Packaged and civil sewage treatment plants for towns, compounds, hotels and industry, with tertiary treatment for irrigation and cooling-water reuse.
Technologies



Industrial effluent treatment and recycling, up to zero liquid discharge (ZLD), where no liquid effluent leaves the site.
Technologies



Clarification and filtration that remove suspended solids, turbidity and colloids before they foul membranes or damage downstream equipment.
Technologies



Ultrapure water for pharmaceuticals, electronics and power generation, where impurities are measured in parts per billion.
Technologies



Treatment chemicals, ion-exchange resins, membranes and spares for cooling towers, boilers, chillers and desalination plants.
Products


In-situ bioremediation with selected, non-pathogenic bacterial cultures and enzymes that degrade sludge, fats, oils and hydrocarbons in lagoons, water bodies, grease traps and pump stations. Delivered with our partner Ecosolus: less sludge to haul, odour control within days and no harsh chemicals.
Where we use it
Some industrial wastewater is too aggressive for a conventional treatment plant.
Pick a sample
Sample 1 of 7 · The problem
Sulfidic spent caustic from refinery fuel treating and ethylene plants: pH above 13, high sulphide and COD, and toxic to conventional biomass.
Influent
pH 13.5
pH 12.5Step 1 of 3
In an enclosed reactor, sulphides and mercaptans are oxidised to thiosulphate and sulphate, so no hydrogen sulphide is released. Off-gas is captured and treated.
pH 7.5Step 2 of 3
Acid is dosed under automatic pH control, bringing the stream down to pH 7 to 8.
pH 7.2Step 3 of 3
The pretreated stream is blended into the effluent treatment plant, where activated sludge removes the remaining COD.
Effluent
pH 7.2 · Neutral
Sample 2 of 7 · The problem
Spent pickling acid from galvanizing and steel finishing: pH below 1, carrying dissolved iron, zinc and other heavy metals.
Influent
pH 0.8
pH 7Step 1 of 3
Bench-scale jar tests set the neutralising agent and coagulant doses, with pH checked at 0, 10, 30 and 60 minutes.
pH 8.5Step 2 of 3
Lime or caustic raises the pH to 8.5 to 9. Iron and zinc precipitate as hydroxides and settle in the clarifier.
pH 8.5Step 3 of 3
A belt press dewaters the hydroxide sludge to a cake for disposal; the clarified overflow meets discharge limits.
Effluent
pH 8.5 · Neutral
Sample 3 of 7 · The problem
Landfill leachate, fertiliser effluent and refinery sour water with over 1,000 mg/l ammonia-nitrogen, toxic to aquatic life.
Influent
Ammonia 1,800 mg/l
Ammonia 300 mg/lStep 1 of 3
At raised pH, blowers strip free ammonia from the water as a gas; the off-gas is scrubbed.
Ammonia 30 mg/lStep 2 of 3
Nitrifying bacteria convert the remaining ammonia to nitrate; denitrification then releases it as harmless nitrogen gas.
Ammonia 5 mg/lStep 3 of 3
Media and cartridge filters bring the effluent within discharge limits.
Effluent
Ammonia 5 mg/l · Within limits
Sample 4 of 7 · The problem
Plating, mining and electronics effluent carrying chromium, nickel, zinc, copper and lead above discharge limits.
Influent
Zinc 221 mg/l
Zinc 40 mg/lStep 1 of 3
Our turbo anodic reactor doses metal ions electrically; the heavy metals co-precipitate as flocs, usually with no chemicals added.
Zinc 2 mg/lStep 2 of 3
The floc is separated as a stable sludge that passes the standard leaching test, so it is safe to dispose of.
Zinc 0.14 mg/lStep 3 of 3
Polishing filters remove the residual solids and traces.
Effluent
Zinc 0.14 mg/l · Within limits
Sample 5 of 7 · The problem
Desalination reject and produced water, far more saline than seawater, with salts worth recovering.
Influent
Salinity 7%
Salinity 20%Step 1 of 3
Our evaporators use ambient air instead of steam to evaporate the water, at a fraction of the energy cost.
Salinity 35%Step 2 of 3
As the brine concentrates, the salts crystallise out, even from brine at 35% salinity.
Salinity DryStep 3 of 3
Lined collection ponds recover the salts and minerals, with zero liquid discharge.
Effluent
No liquid discharge
Sample 6 of 7 · The problem
Washwater, bilge and produced water with stable oil-in-water emulsions that will not separate by gravity.
Influent
Oil 5,000 mg/l
Oil 1,500 mg/lStep 1 of 3
Demulsifier dosing and pH control break the emulsion and release the oil.
Oil 100 mg/lStep 2 of 3
Fine air bubbles float the freed oil and solids to the surface, where they are skimmed off.
Oil 10 mg/lStep 3 of 3
Final filtration brings oil and grease below discharge limits, ready for reuse or discharge.
Effluent
Oil 10 mg/l · Clear
Sample 7 of 7 · The problem
Biological and oily sludge from treatment plants, lagoons and refinery tanks: odorous, and costly to haul to landfill.
Influent
Sludge left 100%
Sludge left 50%Step 1 of 3
Diffused air lets aerobic bacteria break down the organic fraction in an enclosed digester, stabilising the sludge and cutting odour.
Sludge left 20%Step 2 of 3
A screw press dewaters the residue to a firm cake; the filtrate returns to the treatment plant.
Sludge left 0%Step 3 of 3
The stabilised cake is composted for landscaping and agriculture instead of going to landfill.
Effluent
Sludge left 0% · Nothing to landfill
Fig. 3 Readings are indicative, except zinc, which comes from our reactor's test data.
In practice these streams arrive together. Our integrated plant treats spent caustic, spent acid, oily emulsions, metal-bearing and high-ammonia wastewater in one train.
Inlet design basis
200 m³/day of combined hazardous wastewater
Pick a parameter to see which units remove it. Being treated Treated
pH 3–14. Corrected in the cracking tank by automatic pH dosing, so the biology downstream always receives near-neutral water. Stages 3 cracking.
COD 10,000 mg/L. Oxidised in the cracking tank, broken down biologically in the aeration tank, polished by the decolourising resin and finally rejected by RO. Stages 3 cracking, 5 biological, 7 resin beds, 8 UF + RO.
TSS 1,000 mg/L. Coarse solids are screened out, flocs are floated off in the DAF, biomass settles in the lamella clarifier and ultrafiltration removes what remains. Stages 1 screening, 4 DAF, 6 clarifier, 8 UF + RO.
TDS 25,000 mg/L. Dissolved salts pass every other stage and are removed by reverse osmosis. Stages 8 UF + RO.
NH₄ 250 mg/L. Nitrified in the aeration tank and denitrified in the anoxic tank, with RO removing the residual. Stages 5 biological, 8 UF + RO.
SO₄ 5,000 mg/L. Removed with the other dissolved salts by reverse osmosis. Stages 8 UF + RO.
Turbidity 300 NTU. Reduced by the DAF and the lamella clarifier, then brought to irrigation clarity by ultrafiltration. Stages 4 DAF, 6 clarifier, 8 UF + RO.
Heavy metals 20 mg/L. Precipitated as hydroxides in the cracking tank, captured by the metal-removal resin, with RO as the final barrier. Stages 3 cracking, 7 resin beds, 8 UF + RO.
Oil & grease 300 mg/L. Free oil is skimmed in the oil and grease chamber; emulsions are cracked chemically and floated off in the DAF. Stages 2 oil & grease, 3 cracking, 4 DAF.
Stage 01 of 09
Collection sump and coarse screen chamber, 0.5 m³
Hazardous streams from tankers and process lines are received in the collection sump, where they blend and even out before pumping. A coarse bar screen then removes rags, plastics and grit that would block pumps and dosing lines.
Stage 02 of 09
Oil and grease chamber, 3 m³, with belt skimmer
In the quiet chamber, free oil rises behind an underflow baffle and a belt skimmer lifts it off for recovery. Taking it out here protects the chemical and biological stages downstream.
Stage 03 of 09
Cracking tank with desludging, COD-reduction and pH dosing
Dosing breaks oil-in-water emulsions, brings pH from anywhere between 3 and 14 to neutral, and oxidises part of the COD. Heavy metals precipitate as hydroxides and settle into the cone, from where sludge is drawn off.
Stage 04 of 09
DAF system with pressurised air saturator
Air dissolved under pressure is released as micro-bubbles that lift flocs, emulsified oil and suspended solids to the surface, where a chain skimmer removes them as float sludge.
Stage 05 of 09
Anoxic tank, 8 m³, and aeration tank with bio-remediation, 200 m³
Selected bacterial cultures in the aerated tank break down the remaining organics and oxidise ammonia to nitrate. Return sludge carries the nitrate back to the mixed anoxic tank, where it is reduced to nitrogen gas.
Stage 06 of 09
Lamella clarifier, 12.5 m³
Inclined plates give a large settling area in a small footprint. Biomass settles into the cone and returns to the anoxic tank or goes to sludge handling; clarified water overflows the launder.
Stage 07 of 09
Buffer tank, 8.5 m³, with BR dosing, and two resin bed filters in series
From the buffer tank the water is pumped through two resin bed filters: the first captures dissolved heavy metals, the second removes colour and residual organics.
Stage 08 of 09
UF feed tank, 8.5 m³, ultrafiltration, RO feed tank, 10 m³, and reverse osmosis
Ultrafiltration removes colloids, turbidity and bacteria and protects the RO membranes. Reverse osmosis then removes dissolved salts, sulphate and residual ammonia, to give 190 m³/day of treated effluent to the MEWA irrigation standard.
Stage 09 of 09
Sludge holding tank, filter press and sludge drying beds
Sludge from the cracking tank, the DAF float and the clarifier is collected in the holding tank, dewatered in a filter press, and the cake is dried on sludge drying beds before disposal.
Fig. 4 Process flow of a 200 KLD (200 m³/day) integrated effluent treatment plant, drawn from Green Crescent's process flow diagram. Inlet values are the design basis; the treated effluent, 190 m³/day, meets the MEWA standard for irrigation reuse.
Beyond water, we handle solid and liquid waste from start to finish, and build the plants and machines that do the work.
From your gate to the end

01 / 06

02 / 06

03 / 06

04 / 06

05 / 06

06 / 06
Fig. 5 Photographs are illustrative.
Discuss your waste streamOur largest turns 2.4 million litres of salty groundwater into fresh water, every day.
At rated capacity that is about 28 litres a second, or 0 litres since you opened this page.
| To scale | Capacity | Project | Type |
|---|---|---|---|
| 2,400 m³/day2.4 million litres a day | Brackish water reverse osmosis plant | Desalination | |
| 3 × 300 m³/day900,000 litres a day in all | Three reverse osmosis systems | Water treatment | |
| 300 m³/day300,000 litres a day | Reverse osmosis plant | Water treatment | |
| 250 m³/day250,000 litres a day | Reverse osmosis system | Water treatment | |
| 250 m³/day250,000 litres a day | Sewage treatment plant accessories | Sewage treatment |
Equipment built and installed by Green Crescent.



A partial list of the projects and clients Engr. Mohammed Kaleem, our Chairman and CTO, has worked on in water, wastewater, desalination and waste management, across Saudi Arabia, the UAE, Malaysia and India.
| Client | Scope | m³/day |
|---|---|---|
| Al Bhairaq Electro-Mech Works LLC | Sewage lifting station works | – |
| Petro Group of Companies | Wastewater and sewage treatment plant | 2,000 |
| Ducab Labour Camp | Sewage treatment plant | 2,700 |
| Al Naboodah Bros Contracting & Construction Co. LLC | Sewage treatment plant | 3,000 |
| Al Khaleej Sugar LLC | Sewage treatment plant | 4,000 |
| Green Creations Contracting LLC | Sewage treatment plant | 5,000 |
| First Gulf Bank Housing Project | Sewage treatment plant | 5,000 |
| Emaar Contracting LLC | Sewage treatment plant | 10,000 |
| Nakheel Housing Project | Sewage treatment plant | 12,000 |
| Arabian Contracting Co. | Sewage treatment plant | 15,000 |
| Plant | Capacity | With |
|---|---|---|
| North Obhur Plant, Jeddah | – | SAWACO |
| Rabigh | 7,000 m³/day | Wetico |
| National Guard RO plants, Khashm Al-An, Riyadh | – | – |
| Shuaibah III | 150,000 m³/day | Doosan |
| South Jeddah Corniche Plant (SOJECO), Jeddah | – | SAWACO |
| Seawater RO plant, Prince Naif, Obhur, Jeddah | – | – |
| Seawater RO plant, Prince Sheikha Farm | – | – |
| Kalba, Sharjah Electricity and Water Authority (completed 2010) | 15,000 m³/day | CH2M Hill |
| Khor Fakkan | 22,500 m³/day | CH2M Hill |
| Layyah I | 22,500 m³/day | CH2M Hill |
| Ghalilah, RAK | 68,000 m³/day | Aquatech |
| Hamriyah | 90,000 m³/day | Aqua Engineering |
| UAQ Government: reject-water RO plant for potable water | 3 MGD | – |
| Al Zawrah | 27,000 m³/day | Aqua Engineering |
| Emayil and Saadiyat Island | ≈ 20,000 m³/day | Aqua EPC |
| Umm Al Nar desalination plant | 394,000 m³/day | – |
| Al Yasat Al Soghrih Island | 2 MGD (≈ 9,000 m³/day) | – |
Green Crescent is a Jeddah-based engineering company that has delivered water, wastewater, industrial effluent and environmental solutions since 2009, with an office in Kuala Lumpur, Malaysia. Our founders bring more than three decades of experience in the water treatment industry.
We are the only company in South-East Asia manufacturing FRP (fibreglass) tanks for water treatment plants and the only company in the Emirates offering reverse osmosis membrane cleaning for every type and brand of RO element. We also carry the largest stock of calcium hypochlorite and other chlorine-based disinfection chemicals.
Every project is governed by quality assurance, strict health and safety practices and the international and local standards that apply to it.
Sustainable water and environmental solutions are achieved through strong technical foundations, transparent collaboration and a deep understanding of our clients' operational and regulatory challenges.



Logos are trademarks of their respective owners.
Process diagram · PDF
The treatment line for oily refinery wastewater, with typical removal rates for oil, BTEX and TPH.
View Hydrocarbon removal from wastewater (opens in a new tab)Download Hydrocarbon removal from wastewater
Letter · PDF
ProtectGD LLC (USA) introduces Engr. Mohammed Kaleem to present its patented geopolymer technology in Saudi Arabia.
View Letter of introduction, ProtectGD LLC (opens in a new tab)Download Letter of introduction, ProtectGD LLC
Let us know where your site is, how much water you handle and what you need it for. An engineer will get back to you, visit the site if needed and send a proposal.